Wetlands Construction

Project : FOUNTAIN CREEK DRAINAGE
Client : Tezak Heavy Equipment
Location : Colorado Springs, Colorado

Completed approximately 6 acres of wetlands and upland construction work. The wetlands scope of work included 5,600 willow stakes, 734 1-gallon shrubs, 444 5-gallon shrubs, 31,000 square yards of erosion control blanket, 30 salvaged cottonwood branches, and 5-acres of wetland seeding. WSRI installed over 60,400 lineal feet of drip pipe to maintain the wetlands plantings during the establishment period. WSRI also installed a temporary irrigation tap utilizing a fire hydrant and backflow preventor, and installed battery powered irrigation controllers.