Douglas and Niobrara Pipelines

Douglas and Niobrara Pipelines

Project: Douglas and Niobrara Pipelines Client: ONEOK Location: Douglas and Norbrara County, Wyoming Scope of Work: In the fall of 2014, Western States Reclamation Inc. was hired to complete restoration work on two Wyoming pipelines totaling 816 acres in approximately 82 miles. The project required completion before the end of the year. Along with the […]

SDS Pipeline

SDS Pipeline

Project: SDS Pipeline Client: Layne Heavy Civil Location: El Paso County, CO Description: Reclamation for a 50 mile pipeline from Pueblo Reservoir to Colorado Springs. Project faced resistance from landowners due to previous substandard reclamation efforts. WSRI built a massive temporary irrigation system to encourage revegetation. Along with WSRI’s skill and experience in reseeding and […]

Overland Pipeline

OVERLAND PIPELINE

PROJECT: Overland Pipeline CLIENT: CH2M HILL LOCATION: Colorado – Wyoming This project involves the restoration services for the 152 mile Overland Pass Piceance Basin Lateral Pipeline Project. The project stretches from Meeker, Colorado to Wamsutter, Wyoming extending through various ecosystems and terrain. Western States, working with the BLM, CSFS, and multiple landowners will complete over […]

Lakewood Pipeline

KONICA MINOLTA DIGITAL CAMERA

PROJECT: Lakewood Pipeline CLIENT: Barnard Construction LOCATION: Nederland, Colorado Native seed and erosion control along a new water line. The scope of work included silt fencing, jute blanket, bonded fiber matrix, upland seeding, riparian seeding, and wetland seeding. This project also included planting approximately 19,000 shrubs and trees to re-establish forest and shrub land vegetation […]

Kern River Apex Expansion Loop

OLYMPUS DIGITAL CAMERA

PROJECT: Kern River Apex Expansion Loop CLIENT: Barnard Pipeline, Inc. LOCATION: Salt Lake, Utah This project involved revegetation services along 28 miles of some of the nation’s most challenging terrain. This section of pipeline traversed through numerous canyons and across slopes that were over gradients of 2:1. WSRI successfully and safely flew equipment, laborers and materials […]

East Grand Junction Reinforcement Line

Pipeline-Pic2-550

PROJECT: East Grand Junction Reinforcement Line CLIENT: Xcel Energy LOCATION: Grand Junction, CO WSRI performed native seeding and straw application on steep mountain cuts. This project had areas that were impassable to rubber tired equipment. WSRI used hand seeding and mulching in the impassable areas, which contained large boulders placed on the pipeline Right-of-Way.

Anadarko – Uintah Basin

Anadarko Uintah Basin

PROJECT: Anadarko – Uintah Basin CLIENT: Anadarko LOCATION: Vernal, Utah This project included the revegetation and soil stabilization for 32 well pads and 46 miles of pipeline in Vernal, Utah. Over 419 acres of land was prepared, amended, stabilized, and revegetated by WSRI crews on or ahead of schedule. Challenges that WSRI encountered on the […]

Niobrara Gathering System

Niobrara Gathering System

Project: Niobrara Gathering System Client: ConocoPhillips Location: Arapahoe City, Colorado Scope of Work: Erosion Control and Revegetation of gathering lines. Work has consisted of many short lines totaling in seven miles of compost erosion logs being installed and over 200 acres seeded and mulched, 40 of which were covered with erosion control mats.